Recent Projects

JFK AIRPORT-BAYSIDE RUNWAY REHABILITATION

Project:?JFK Airport Bay Runway Restoration, Jamaica, NY

Prime Contractor:?Tutor Perini Corporation

At JFK Airport in Jamaica, NY we performed over 100,000 LF of kerf cutting (trenching for electrical conduit); cleaning up without special force feed loading conveyor, 30,000 LF of underdrain trenching with our Vermeer trenchers with the loading conveyor attachment, as well as full depth concrete removal with a rock hawg.

PHILADELPHIA AIRPORT

Project:?Philadelphia International Airport Runway 4-22 relighting project; Philadelphia PA

Prime Contractor:?AP Construction Inc

At Philadelphia Airport, we worked hand in hand with AP Construction of Blackwood NJ to kerf cut over 75,000 LF of electrical conduit for the relighting project on the main runway. The majority of the work was done at night with the existing and new lights being relit at the end of each shift.

PLAINSBORO MEDICAL CENTER

Project:?Route Plainsboro Medical Center; Plainsboro, NJ

Prime Contractor:?Tishman

Our Customer:?Vollers Excavating and Construction

We trenched for utilities through solid rock after the main foundations and steel of the building were installed. We brought our Vermeer 955 Commander 3 under the superstructure of the new building to cut for sewer, water and oxygen lines.

7TH AVE. SUBWAY EXTENSION

Project:?7th Ave. Subway Extension;?New York, NY

Prime Contractor:?Scalamandre Construction

Under 11th Ave. by the Javits Center, we cut solid granite to make way for the 7th Ave. subway extension project. We used our rock saw with reverse cutting to penetrate the very hard rock.

MONTCLAIR STATE UNIVERSITY

Project:?Montclair State University Student Housing; Montclair, NJ

Prime Contractor:?Terminal Construction

Our Customer:?Vollers Excavating and Construction

We were called in last minute, mobilized, and cut through solid rock for a water main installation around the new student housing buildings.

RT 517 GAS MAIN

Project:?Route 517 Gas Main Installation

Prime Contractor:?Henkels and McCoy, Skoda Contracting, Lantier Construction

On this project we worked for 3 different contractors. We trenched for 8? ? 12? gas main installations through rock and cobble soils from Route 23 in Franklin NJ, 30 miles down route 517 to Hackettstown, NJ. The project lasted over a year and had 3 of our trenchers on it at multiple times.

ALEXANDRIA GAS MAIN

Project:?Frenchtown Gas Main Installations; Frenchtown, NJ

Prime Contractor:?Penn Bower Inc, Skoda Contracting

By the use of our Tesmec 900 SLO self-loading trencher, we were able to cut through solid rock, load trucks simultaneously, and leave the trench ready and clean for gas main installation.

BLISS WIND FARM

Project:?Bliss Windfarm, Bliss and Cohocton, NY

Prime Contractor:?Henkels and McCoy Inc.

We have trenched through solid rock in extreme weather to install miles of high voltage cable for new wind farms.

QUARRY HEIGHTS SEWER

Project: Quarry Heights Sewer Installation, North Castle, NY

Prime Contractor: Core Contracting of NY LLC

On this project, we reversed the segments on the rock saw to get optimal tooth breakout force. The machine cut through solid granite?and backfilled the trench. The contractor came back later and dug the trench with ease, eliminating the need for hammers and blasting.